Left Right

Completed Projects

Completed Projects

IN THE CITY of MECCA;

9.000.000m3 of granite rock has been mucked around Holly Kaaba in the scope of 3rd Kaaba Extension Project since 2009. Pedestrian and traffic tunnels with the total length of 20 km and width of 11.40 m; underground parking construction for the palace of the king with 25 m span; underground water storage construction for Zemzem water which is accepted as holy water by Muslims.

 

IN THE CITY of TAYF;

Road construction and ground strengthening works between Tayf and Mecca

 

IN THE OTHER CITIES of KINGDOM of SAUDI ARABIA;

3 tunnel projects with the total length of 13 km. which belong to the Ministry of Transport.

 

 Click here to see Completed Projects photo gallery

Technical Information:

Mina Tunnels Project # 6 (Pedestrian Tunnels)
Tunnel 6A :

Width 11,40 mt
Height 9,00 mt
Lenght 330,00 mt
Thickness of Concrete Lining 40,00 cm

Tunnel 6B :

Widht 11,40 mt
Height 9,00 mt
Lenght 570,00 mt
Thickness of Concrete Lining 40,00 cm

Tunnel 6C :

Widht 11,40 mt
Height 9,00 mt
Lenght 630,00 mt
Thickness of Concrete Lining 40,00 cm

 

Kudai – Ajyad Traffic Tunnels and Roads Project

Widht 11,4 mt
Height 9,00 mt
Length (2×1620 meter) 3.240,00 mt
Thickness of Concrete Lining 40,00 cm
Roads (2×1000 meter 2 line each) 2.000,00 mt

 

Mina Storm Water Drainage System Tunnels Project

Widht 6,00 mt
Height 6,00 mt
Length (2×1620 meter) 3.600,00 mt
Thickness of Concrete Lining 40,00 cm

 

Box Culvert :

3 x 3.00 m x 3.00 m
Length : 400 m

 

Percolation Dam Project (with 80.000 m³ reservoir )

Widht 63,00 mt
Height 10,00 mt
Lenght 75,00 mt

 

Zamzam Water Storage Tunnels Project

Volume 10.000,00
Widht 11,40 mt
Height 9,00 mt
Lenght 250,00 mt
Thickness of Concrete Lining 40,00 cm

 

Jabal Qubais Car Park Tunnels Project

Tunnel 1A:

Widht 25,00 mt
Height 10,00 mt
Lenght 150,00 mt
Thickness of Concrete Lining 40,00 cm

Tunnel 1B:

Widht 25,00 mt
Height 10,00 mt
Lenght 150,00 mt
Thickness of Concrete Lining 40,00 cm

 

Jabal Qubais Car Park Tunnels Project

Tunnel 2A:

Widht 25,00 mt
Height 10,00 mt
Lenght 150,00 mt
Thickness of Concrete Lining 40,00 cm

Tunnel 2B:

Widht 25,00 mt
Height 10,00 mt
Lenght 150,00 mt
Thickness of Concrete Lining 40,00 cm

 

Majar Al Kabsh Concrete Dam Project

Widht 15,00 mt
Height 25,00 mt
Lenght 75,00 mt

 

North King Khaled Concrete Dam Project

Widht 17,00 mt
Height 29,00 mt
Lenght 130,00 mt

 

Western Shoaib Concrete Dam Project

Widht 19,00 mt
Height 37,00 mt
Lenght 140,00 mt

Electro mechanical works are also completed in all projects.